Call 8:00-20:00 or write 24/7

Hydraulic boards Soosan SUP-30-RC

Brand: SOOSAN
Code: 746
Inf:
EAN: Южная Корея
ISBN: Навесное
1,500 руб.
0 руб.
0 руб.
In Stock
The Soosan SUP-30-RC Hydraulic Board Rental in St. Petersburg is the perfect choice for a variety of construction projects. This rental offers a powerful 30-ton force, a maximum operating pressure of 700 bar and a working speed of 0-8 m/min. It features a robust construction, including a heavy-duty ...
Main characteristics
Producing country
South Korea
Equipment
Distributors are installed
yes
engine's type
Hydraulic pump
The hydroelectric station has been installed
yes
Hydroelectric station
Maximum oil consumption, l/min
250
The mass of the excavator min., t
28
The oil consumption is minimal, l/min
150
...


The Soosan SUP-30-RC Hydraulic Board Rental in St. Petersburg is the perfect choice for a variety of construction projects. This rental offers a powerful 30-ton force, a maximum operating pressure of 700 bar and a working speed of 0-8 m/min. It features a robust construction, including a heavy-duty steel frame and an ergonomic design. The board is equipped with a long-lasting hydraulic motor and has a maximum stroke of 500mm. It also has a two-speed gearbox, allowing you to adjust the speed according to your project needs. This rental is easy to operate and maintain, making it the perfect choice for your construction needs.
Main characteristics
Producing country South Korea
Equipment
Distributors are installed yes
engine's type Hydraulic pump
The hydroelectric station has been installed yes
Hydroelectric station
Maximum oil consumption, l/min 250
The mass of the excavator min., t 28
The oil consumption is minimal, l/min 150
The pressure of the hydroelectric station is working, MPa 32
Hydraulic boards
Disclosure of the jaws of hydraulicities, m 1,045
Mark of the hydraulic boards Soosan
Model of hydraulic boards SUP-30-RC
The mass of hydraulic boards, t 2,54
Type of hydraulic boards Concrete

Individuals can pay in cash or by bank card upon receipt of the equipment. Delivery is carried out by agreement of the parties, usually by our company. The contract is signed on the spot.

Legal entities sign an agreement in advance, pay by bank transfer. Delivery is agreed by the parties.

Write a review
Note: HTML is not translated!

There are no reviews for this product.

Tags: #Dismantling, #Concrete